COW Procedures

As part of our overall Control of Work (COW) process, RM requires that procedures be followed for certain types of work being conducted on RM sites. The areas currently identified are as follows:

  • Hoisting & Lifting
  • Energy Isolation – Lockout/Tagout
  • Traffic Control
  • Ground Disturbance – Drilling
  • Management of Change

Electronic versions of the procedures are available in this section.

 

>
>
>
>
>